ICMS Cost definitions

Cost categories

Costs are categorised into four levels as follows:

  • level 1: project or subproject
  • level 2: cost categories
  • level 3: cost groups
  • level 4: cost sub-groups

Surface and underground drainage

Parent: Construction Costs
Surface and underground drainage costs include:
  • Surface water drainage
  • Storm water drainage
  • Foul and waste water drainage
  • Drainage disconnections and connections
  • CCTV inspection of existing or new drains
  • Buried process pipe